Highway construction: the pre fabrication compare to conventional method with special refers to SPRINT highway of Kuala Lumpur design and construction of segmental bridge ramps / Mohd. Haniff Omar
Since the beginning of the 21st century, as the automobile has offered ever higher levels of mobility in Malaysia especially Kuala Lumpur, vehicle ownership per head of population has increased. Road needs have been strongly influenced by this popularity and also by the mass movement of people to ci...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2001
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/62698/1/62698.pdf https://ir.uitm.edu.my/id/eprint/62698/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|