Repairing work during defect liability period case study at TPI Jalan Halimah, Tampoi, byJohor / Mohamad Hafiq Danial Hamdan
This report will be explains about repairment work during Defect Liability period in construction. Defect in construction is an important element in construction work. In this report I will be explain about how defect work in construction base on Gerbang Nusajaya ways. This report is divided into se...
Saved in:
Main Author: | Hamdan, Mohamad Hafiq Danial |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/46797/1/46797.pdf http://ir.uitm.edu.my/id/eprint/46797/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Defect liability period, DLP (contractor responsibilities) / Abdillah Azizi Abdul Mu’en
by: Abdul Mu’en, Abdillah Azizi
Published: (2018) -
Defect liability period / Muhamad Zairi Hamdan
by: Hamdan, Muhamad Zairi
Published: (2022) -
Condition survey assessment based on BCIT software / Siti Nur Zaainfah Udent
by: Udent, Siti Nur Zaainfah
Published: (2014) -
Investigation of defects during liability period / Azfar Danial Isyraf Anuaridhuan
by: Anuaridhuan, Azfar Danial Isyraf
Published: (2019) -
A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
by: Che Zulkifli, Zarul Azkief
Published: (2009)