Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
Addressing the issues of compability between Industrialised Building System (IBS) in Interior Construction. A Case Study In Kuala Lumpur. The CIBD Malaysia (2001) defines IBS as a construction technique in which components are manufactured in a controlled environment (on or off-site), positioned, tr...
Saved in:
Main Author: | Ali, Khadijah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Online Access: | https://ir.uitm.edu.my/id/eprint/37299/1/37299.pdf https://ir.uitm.edu.my/id/eprint/37299/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Compatibility issues of Industrialized Building System (IBS) in interior construction: a case study in Kuala Lumpur
by: Yaman, Rostam, et al.
Published: (2019) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
Published: (2014) -
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)