Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali

Addressing the issues of compability between Industrialised Building System (IBS) in Interior Construction. A Case Study In Kuala Lumpur. The CIBD Malaysia (2001) defines IBS as a construction technique in which components are manufactured in a controlled environment (on or off-site), positioned, tr...

Full description

Saved in:
Bibliographic Details
Main Author: Ali, Khadijah
Format: Thesis
Language:English
Published: 2017
Online Access:https://ir.uitm.edu.my/id/eprint/37299/1/37299.pdf
https://ir.uitm.edu.my/id/eprint/37299/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.37299
record_format eprints
spelling my.uitm.ir.372992023-08-17T02:04:14Z https://ir.uitm.edu.my/id/eprint/37299/ Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali Ali, Khadijah Addressing the issues of compability between Industrialised Building System (IBS) in Interior Construction. A Case Study In Kuala Lumpur. The CIBD Malaysia (2001) defines IBS as a construction technique in which components are manufactured in a controlled environment (on or off-site), positioned, transported and assembled into a structure with minimal additional site works. Such 'as, component that are being pre fabricated in a controlled environment on-site are also considered as IBS. Main problem is when the contractors have bad workmanship during the interior construction in the existing building that using IBS components. The aim of this research to identify the issues of compabilty of Interior construction in IBS components. This study will concentrate on interior construction works from the existing building that using of IBS components. The importance of this research is to establish design for solution the issues during the interior construction form the existing building that using IBS components. This research also develops design criteria of IBS components that have advantage and disadvantage in interior construction industry in Malaysia. According to this study, the availability of knowledge and information on IBS components for interior construction will be contribute to others. The outcome of this research also develops new design criteria benefits to designer that using IBS components at site. In long term this research will implement as set of guidelines and additional knowledge that may encourage usage of user and CIDB. 2017 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/37299/1/37299.pdf Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali. (2017) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
description Addressing the issues of compability between Industrialised Building System (IBS) in Interior Construction. A Case Study In Kuala Lumpur. The CIBD Malaysia (2001) defines IBS as a construction technique in which components are manufactured in a controlled environment (on or off-site), positioned, transported and assembled into a structure with minimal additional site works. Such 'as, component that are being pre fabricated in a controlled environment on-site are also considered as IBS. Main problem is when the contractors have bad workmanship during the interior construction in the existing building that using IBS components. The aim of this research to identify the issues of compabilty of Interior construction in IBS components. This study will concentrate on interior construction works from the existing building that using of IBS components. The importance of this research is to establish design for solution the issues during the interior construction form the existing building that using IBS components. This research also develops design criteria of IBS components that have advantage and disadvantage in interior construction industry in Malaysia. According to this study, the availability of knowledge and information on IBS components for interior construction will be contribute to others. The outcome of this research also develops new design criteria benefits to designer that using IBS components at site. In long term this research will implement as set of guidelines and additional knowledge that may encourage usage of user and CIDB.
format Thesis
author Ali, Khadijah
spellingShingle Ali, Khadijah
Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
author_facet Ali, Khadijah
author_sort Ali, Khadijah
title Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
title_short Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
title_full Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
title_fullStr Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
title_full_unstemmed Addressing the issues of compability between industrialised building system (IBS) in interior construction. a case study in Kuala Lumpur / Khadijah Ali
title_sort addressing the issues of compability between industrialised building system (ibs) in interior construction. a case study in kuala lumpur / khadijah ali
publishDate 2017
url https://ir.uitm.edu.my/id/eprint/37299/1/37299.pdf
https://ir.uitm.edu.my/id/eprint/37299/
_version_ 1775626301107863552
score 13.211869