Development of construction waste minimisation plan in construction site / Zulikha Abdul Talib
Construction industry in Malaysia contributes a rapid growth in the last decade. However, the recent construction industry is undertaking pressure to practice waste minimization due to the over-production of waste. Facing problem such as money priority by contractor compared to responsible on ecosys...
Saved in:
Main Author: | Abdul Talib, Zulikha |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/108663/1/108663.pdf https://ir.uitm.edu.my/id/eprint/108663/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Minimising construction disputes
by: Wahi, Noraziah
Published: (2008) -
Minimisation of Construction Waste Using the Principles of Waste Management
by: Ting, Sim Nee, et al.
Published: (2022) -
Structural-semantic analysis: a method towards a classification of Malaysian folktale / Harryizman Harun and Zulikha Jamaludin
by: Harun, Harryizman, et al.
Published: (2014) -
Dewan Bandaraya Kuala Lumpur / Muhammad Afif Abu Talib
by: Abu Talib, Muhammad Afif
Published: (2019) -
Waste minimisation and the environment
by: Suhaimi, Abdul-Talib, Ir. Dr., et al.
Published: (2011)