Design Calculation ofthe Upgraded Equipments for Residue Plant Under Different Operating Capacity
The increase in demand of residue due to new production of Group III Lube Base Oil Product in Melaka Refmery required the residue plant to increase the feeding capacity of residue to the required unit. For the plant to achieve the targeted flow rate of the residue, the residue plant has upgraded...
Saved in:
Main Author: | Abd Rashid @ Abd Rasip, Mohd Hanafi |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi Petronas
2009
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/8817/1/2009%20Bachelor%20-%20Design%20Calculation%20Of%20The%20Upgraded%20Equipments%20For%20Residue%20Plant%20Under%20Different%20O.pdf http://utpedia.utp.edu.my/8817/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design Calculation of the Upgraded Equipments for Residue Plant Under Different
Operating Capacity
by: Mohd Hanafi Bin Abd Rashid @ Abd Rasip, Mohd Hanafi
Published: (2009) -
Equipment upgrade for JPAM - Wan Junaidi
by: New Straits, Times
Published: (2013) -
Dynamic Loading Analysis ofthe Telescopic Jetty Gangway
by: Hamid, Ashiran
Published: (2010) -
Employees Dismissal Cases: Analysis ofthe Industrial Court Awards
by: Mohd Zaki, Abdul Khalil
Published: (2007) -
Upgrading electrical equipment / Muhammad Qayyim Ahmad Kussaimi
by: Ahmad Kussaimi, Muhammad Qayyim
Published: (2021)