Design Calculation ofthe Upgraded Equipments for Residue Plant Under Different Operating Capacity

The increase in demand of residue due to new production of Group III Lube Base Oil Product in Melaka Refmery required the residue plant to increase the feeding capacity of residue to the required unit. For the plant to achieve the targeted flow rate of the residue, the residue plant has upgraded...

Full description

Saved in:
Bibliographic Details
Main Author: Abd Rashid @ Abd Rasip, Mohd Hanafi
Format: Final Year Project
Language:English
Published: Universiti Teknologi Petronas 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/8817/1/2009%20Bachelor%20-%20Design%20Calculation%20Of%20The%20Upgraded%20Equipments%20For%20Residue%20Plant%20Under%20Different%20O.pdf
http://utpedia.utp.edu.my/8817/
Tags: Add Tag
No Tags, Be the first to tag this record!