Flowrate Measurement Based on ECD Behavior in Cementing HPHT Well
Cementing in HPHT well is approach used by many players in the oil and gas industry nowadays. This is due to most of reserve is situated in deeper location compare with regular well drill before. In order to perform cementing process in this location, it is very challenging. This is because the HPHT...
Saved in:
Main Author: | Aziz, Muhammad Rafiuddin |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi Petronas
2013
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/10693/1/FYP%20Final%20Report.rev%200.pdf http://utpedia.utp.edu.my/10693/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Cementing Design For the HPHT Well By Using Land Mark
Software
by: Humza, Malik Muhammad
Published: (2013) -
TESTING COCONUT SHELLS, SEASHELLS AND SARAWAK COAL AS CEMENT ADDITIVES FOR HPHT WELLS CEMENTING.
by: Yunus Tagayev, Yunus
Published: (2012) -
Designing a Cement Program by Using Landmark Software at HPHT Well
by: Hafizul Naim Bin Baniram, Hafizul Naim
Published: (2012) -
Pore Pressure Estimation in HPHT Wells
by: Alias, Abdul Hakim
Published: (2011) -
High Pressure High Temperature (HPHT) Well Design
by: Mohd Sukri, Eskandar
Published: (2013)