Makespan Minimization of Machines and Automated Guided Vehicles Schedule Using Binary Particle Swarm Optimization
An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in improving the performance of a Flexible Manufacturing System (FMS). Among the main elements in the implementation of AGV is task scheduling. This is due to the fact that efficient scheduling would enable...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | en |
| Published: |
2010
|
| Subjects: | |
| Online Access: | http://eprints.utem.edu.my/id/eprint/20223/1/Makespan%20Minimization%20of%20Machines%20and%20iaeng.pdf http://eprints.utem.edu.my/id/eprint/20223/ http://www.iaeng.org/publication/IMECS2010/IMECS2010_pp1897-1902.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
