Labour Productivity Measurement Method for Malaysian Housing Industry
The industrialised building system (IBS) was introduced in Malaysia in 1966, but it failed to establish itself though there is a sustained large market for residential projects. One of the main reasons behind this failure is a lack of scientific data on labour productivity in the construction ind...
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | en English |
| Published: |
2005
|
| Subjects: | |
| Online Access: | http://psasir.upm.edu.my/id/eprint/7078/1/FK_2005_41%28a%29.pdf http://psasir.upm.edu.my/id/eprint/7078/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
