Identification of Time Wastage Towards Lean Production for IBS: A Case Study of Precast Hollow Core Slab Production
The introduction of Industrialized Building System (IBS) is thought to hasten the construction process when it is substituted from the traditional cast-in-place approach to the factory-made precast component. Since IBS components manufacturing may boost its productivity using Lean Production to cut...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | en |
| Published: |
International Information and Engineering Technology Association (IIETA)
2025
|
| Subjects: | |
| Online Access: | http://ir.unimas.my/id/eprint/50771/1/jesa_58.03_19.pdf http://ir.unimas.my/id/eprint/50771/ https://www.iieta.org/journals/jesa/paper/10.18280/jesa.580319 https://doi.org/10.18280/jesa.580319 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
