Identification of Time Wastage Towards Lean Production for IBS: A Case Study of Precast Hollow Core Slab Production

The introduction of Industrialized Building System (IBS) is thought to hasten the construction process when it is substituted from the traditional cast-in-place approach to the factory-made precast component. Since IBS components manufacturing may boost its productivity using Lean Production to cut...

Full description

Saved in:
Bibliographic Details
Main Authors: Rohaida, Affandi, Izni Syahrizal, Ibrahim, Masine, Md Tap, Aliff Ridzuan, Bunawan
Format: Article
Language:en
Published: International Information and Engineering Technology Association (IIETA) 2025
Subjects:
Online Access:http://ir.unimas.my/id/eprint/50771/1/jesa_58.03_19.pdf
http://ir.unimas.my/id/eprint/50771/
https://www.iieta.org/journals/jesa/paper/10.18280/jesa.580319
https://doi.org/10.18280/jesa.580319
Tags: Add Tag
No Tags, Be the first to tag this record!