Resetting the ground fault relay on a 28 MVA power transformer due to grounding method retrofit
. The goal of the retrofit at Zamrud substation is to transform a 28 MVA power transformer's neutral point grounding system from direct grounding to grounding using a 20 Ohm Neutral Grounding Resistor (NGR). The amount of short-circuit current produced will fluctuate with the installation of NG...