Designing a future value stream mapping to reduce lead time using SMED-A case study

Many manufacturers struggle with improving productivity, producing the right products or services at the right place and meeting on-time delivery. To survive in today`s era competitive world, manufacturers need to find new ways to reduce the manufacturing lead times in order to improve productivity...

Full description

Saved in:
Bibliographic Details
Main Authors: Amir, Azizi, Manoharan, Thulasi
Format: Conference or Workshop Item
Language:en
Published: Elsevier Ltd 2015
Subjects:
Online Access:https://umpir.ump.edu.my/id/eprint/47115/1/Designing%20a%20future%20value%20stream%20mapping.pdf
https://umpir.ump.edu.my/id/eprint/47115/
https://doi.org/10.1016/j.promfg.2015.07.027
Tags: Add Tag
No Tags, Be the first to tag this record!