Designing a future value stream mapping to reduce lead time using SMED-A case study
Many manufacturers struggle with improving productivity, producing the right products or services at the right place and meeting on-time delivery. To survive in today`s era competitive world, manufacturers need to find new ways to reduce the manufacturing lead times in order to improve productivity...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | en |
| Published: |
Elsevier Ltd
2015
|
| Subjects: | |
| Online Access: | https://umpir.ump.edu.my/id/eprint/47115/1/Designing%20a%20future%20value%20stream%20mapping.pdf https://umpir.ump.edu.my/id/eprint/47115/ https://doi.org/10.1016/j.promfg.2015.07.027 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
