Enhancing the contractual provision for suspension of work in Malaysia: a comparative analysis with emphasis on a case study of government contract form PWD203A

The government possesses the authority to halt or delay work on-site, either partially or entirely, through the suspension of works as outlined in Clause 50 of the Public Works Department's PWD203A contract form. However, the global outbreak of covid-19 pandemic has revealed the lack of attent...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad Anwar, Anisha Syazwani, Mohd-Danuri, Mohd Suhaimi, Mahdzir, Mazura, Mustafa, Muhammad Hadi, Syed Khuzzan Alhabshi, Sh Mazlina
Format: Article
Language:en
en
Published: Malaysian Institute Of Planners 2024
Subjects:
Online Access:http://irep.iium.edu.my/121402/7/121402_Enhancing%20the%20contractual%20provision_Scopus.pdf
http://irep.iium.edu.my/121402/8/121402_Enhancing%20the%20contractual%20provision.pdf
http://irep.iium.edu.my/121402/
https://www.planningmalaysia.org/index.php/pmj/article/view/1609
https://doi.org/10.21837/pm.v22i34.1609
Tags: Add Tag
No Tags, Be the first to tag this record!