Major blocking factors affecting the application of industrialized building system
Industrialized construction continues to emerge globally. Developing countries like Malaysia are still unable to increase industrialized building system (IBS) implementation significantly, demonstrated by the low IBS percentage of less than 3. Therefore, this research aims to determine the factors b...
Saved in:
Main Authors: | Al-Aidrous, A.-H.M.H., Shafiq, N., Rahmawati, Y., Mohammed, B.S., Al-Ashmori, Y.Y., Baarimah, A.O., Alawag, A.M. |
---|---|
Format: | Article |
Published: |
Ain Shams University
2023
|
Online Access: | http://scholars.utp.edu.my/id/eprint/37346/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85146579968&doi=10.1016%2fj.asej.2023.102151&partnerID=40&md5=7b96a97483a3dc920cb9085e9f98a4a3 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Major blocking factors affecting the application of industrialized building system
by: Al-Aidrous, A.-H.M.H., et al.
Published: (2023) -
Investigation of the current Innovative Industrialized Building Systems (IBS) in Malaysia
by: Al-Aidrous, A.-H.M.H., et al.
Published: (2021) -
�Values, Challenges, and Critical Success Factors� of Building Information Modelling (BIM) in Malaysia: Experts Perspective
by: Al-Ashmori, Y.Y., et al.
Published: (2022) -
�Values, Challenges, and Critical Success Factors� of Building Information Modelling (BIM) in Malaysia: Experts Perspective
by: Al-Ashmori, Y.Y., et al.
Published: (2022) -
Integration of Building Information Modeling (BIM) and Value Engineering in Construction Projects: A Bibliometric Analysis
by: Baarimah, A.O., et al.
Published: (2021)