Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project by Hanapi Fait,
Saved in:
Main Author: | Hanapi Fait, |
---|---|
Format: | thesis |
Language: | English |
Published: |
N/A
2015
|
Subjects: | |
Online Access: | https://ir.upsi.edu.my/detailsg.php?det=1271 https://ir.upsi.edu.my/detailsg.php?det=1271 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Post contract work during defect liability period / Nursyahirah Yusri
by: Yusri, Nursyahirah
Published: (2019) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
An institution in search of excellence: lessons learnt
by: Fatimah, H., et al.
Published: (2005) -
Occurrences of building defects during defects liability periods of low-cost housing projects / Addruse Hassan
by: Hassan, Addruse
Published: (2006) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010)