An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry
Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
ExcelingTech Publishers
2020
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31955/1/IJSCM%2009%2002%202020%201108-1114.pdf https://repo.uum.edu.my/id/eprint/31955/ https://ojs.excelingtech.co.uk/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.31955 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.319552025-01-23T14:22:29Z https://repo.uum.edu.my/id/eprint/31955/ An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry Abdul Rahim, Mohd Kamarul Irwan Yaakob, Mazri Ahmad Zaidi, Mohamad Faizal S.R. Nadarajan, Santhirasegaran Zainol, Zuraidah HD28 Management. Industrial Management Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the customers’ inventory while confirming that no stock-out. The supplier indicates when each delivery time takes place, so that the customers are no longer responses to the customers' orders. Under the VMI system, the planning is proactive as it is based on the available information rather than reactive to customers' orders. Consequently, in this paper, we expected that the demand at the construction sites are constant and stationary, and the construction consolidation centre (CCC) is implementing a VMI system. The concentration of this paper is to minimize the transportation and inventory holding costs of the customers for a two-stage supply chain system in the construction industry. The problem is to identify what is the delivery quantities to the construction sites, what is delivery times and which routes should be used to deliver products to the customers at the construction site for the single-period deterministic inventory routing problem (SP-DIRP) in the construction sector. Furthermore, realistic side-constraints such as driving time restrictions, storage capacities constraints and constant replacement intervals are considered. Results of a simplified real-life case implementing the proposed linear mixed-integer program are shown and discussed in detail ExcelingTech Publishers 2020 Article PeerReviewed application/pdf en cc4_by_nc https://repo.uum.edu.my/id/eprint/31955/1/IJSCM%2009%2002%202020%201108-1114.pdf Abdul Rahim, Mohd Kamarul Irwan and Yaakob, Mazri and Ahmad Zaidi, Mohamad Faizal and S.R. Nadarajan, Santhirasegaran and Zainol, Zuraidah (2020) An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry. International Journal of Supply Chain Management (IJSCM), 9 (2). pp. 1108-1114. ISSN 2051-3771 https://ojs.excelingtech.co.uk/ |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutional Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Abdul Rahim, Mohd Kamarul Irwan Yaakob, Mazri Ahmad Zaidi, Mohamad Faizal S.R. Nadarajan, Santhirasegaran Zainol, Zuraidah An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry |
description |
Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the customers’ inventory while confirming that no stock-out. The supplier indicates when each delivery time takes place, so that the customers are no longer responses to the customers' orders. Under the VMI system, the planning is proactive as it is based on the available information rather than reactive to customers' orders. Consequently, in this paper, we expected that the demand at the construction sites are constant and stationary, and the construction consolidation centre (CCC) is implementing a VMI system. The concentration of this paper is to minimize the transportation and inventory holding costs of the customers for a two-stage supply chain system in the construction industry. The problem is to identify what is the delivery quantities to the construction sites, what is delivery times and which routes should be used to deliver products to the customers at the construction site for the single-period deterministic inventory routing problem (SP-DIRP) in the construction sector. Furthermore, realistic side-constraints such as driving time restrictions, storage capacities constraints and constant replacement intervals are considered. Results of a simplified real-life case implementing the proposed linear mixed-integer program are shown and discussed in detail |
format |
Article |
author |
Abdul Rahim, Mohd Kamarul Irwan Yaakob, Mazri Ahmad Zaidi, Mohamad Faizal S.R. Nadarajan, Santhirasegaran Zainol, Zuraidah |
author_facet |
Abdul Rahim, Mohd Kamarul Irwan Yaakob, Mazri Ahmad Zaidi, Mohamad Faizal S.R. Nadarajan, Santhirasegaran Zainol, Zuraidah |
author_sort |
Abdul Rahim, Mohd Kamarul Irwan |
title |
An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry |
title_short |
An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry |
title_full |
An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry |
title_fullStr |
An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry |
title_full_unstemmed |
An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry |
title_sort |
algorithm model for solving the single-period inventory transportation problems in the construction industry |
publisher |
ExcelingTech Publishers |
publishDate |
2020 |
url |
https://repo.uum.edu.my/id/eprint/31955/1/IJSCM%2009%2002%202020%201108-1114.pdf https://repo.uum.edu.my/id/eprint/31955/ https://ojs.excelingtech.co.uk/ |
_version_ |
1823096365290356736 |
score |
13.235796 |