A Review of Traditional Project Procurement Towards Integrated Practice
As a new integrated procurement approach, Integrated Project Delivery (IPD) has been introduced as an alternative towards improving sustainability and integrated construction performance. Currently, however, most of the project procurement or method in Malaysia are still based on the traditional c...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar, Ahmed, Vian |
---|---|
Format: | Article |
Language: | English |
Published: |
AENSI
2014
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31731/1/AEJSA%2008%2002%2065-70%202014.pdf https://repo.uum.edu.my/id/eprint/31731/ http://www.aensiweb.com/AEJSA |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Review of Traditional Project Procurement Towards Integrated Practice
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Project procurement method : the conflicts in construction projects procured under design and build method
by: Mai Ling, Teon
Published: (2014) -
Construction procurement practice: a review study of Integrated Project Delivery (IPD) in the Malaysian construction projects
by: Syed Zuber, Sharifah Zaliha, et al.
Published: (2019) -
E-Procurement Implementation for Projects (Analysis, Challenges, and Solutions)
by: Jalal Faraj, Salem Almadani
Published: (2016) -
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
by: Osman, Wan Nadzri, et al.
Published: (2015)