Readiness in Knowledge and Ability for Implementation of Industrialised Building System (IBS) In Malaysian Construction Industry
This study explores the key factors of readiness in implementation of Industrialised Building System (IBS) in Malaysian Construction Industry. Previous studies pointed out that readiness issues are one of the barriers in implementation of IBS. Readiness is a preparation for something, or willing and...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31633/1/IIBS%2039%2009%2047-53%202016.pdf https://repo.uum.edu.my/id/eprint/31633/ https://www.researchgate.net/publication/312059691 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.31633 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.316332024-12-17T13:54:02Z https://repo.uum.edu.my/id/eprint/31633/ Readiness in Knowledge and Ability for Implementation of Industrialised Building System (IBS) In Malaysian Construction Industry Tamrin, Norhidayah Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar HD28 Management. Industrial Management This study explores the key factors of readiness in implementation of Industrialised Building System (IBS) in Malaysian Construction Industry. Previous studies pointed out that readiness issues are one of the barriers in implementation of IBS. Readiness is a preparation for something, or willing and able to do something which is a very important criteria to make the successfull of the changes process from traditional method to IBS. Therefore, this study was conducted to come out with the factor that influenced readiness in implementation of IBS. In this study, interview was selected as research technique in data collection process and there are four interview participant, which is from multidisciplinary IBS practitioner. The result show that the readiness in knowledge and ability are the most important aspect that should be highlighted before implement IBS 2016 Article PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/31633/1/IIBS%2039%2009%2047-53%202016.pdf Tamrin, Norhidayah and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar (2016) Readiness in Knowledge and Ability for Implementation of Industrialised Building System (IBS) In Malaysian Construction Industry. Rev. Téc. Ing. Univ. Zulia., 39 (9). pp. 47-53. https://www.researchgate.net/publication/312059691 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutional Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Tamrin, Norhidayah Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Readiness in Knowledge and Ability for Implementation of Industrialised Building System (IBS) In Malaysian Construction Industry |
description |
This study explores the key factors of readiness in implementation of Industrialised Building System (IBS) in Malaysian Construction Industry. Previous studies pointed out that readiness issues are one of the barriers in implementation of IBS. Readiness is a preparation for something, or willing and able to do something which is a very important criteria to make the successfull of the changes process from traditional method to IBS. Therefore, this study was conducted to come out with the factor that influenced readiness in implementation of
IBS. In this study, interview was selected as research technique in data collection process and there are four interview participant, which is from multidisciplinary IBS practitioner. The result show that the readiness in knowledge and ability are the most important aspect that should be highlighted before implement IBS |
format |
Article |
author |
Tamrin, Norhidayah Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar |
author_facet |
Tamrin, Norhidayah Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar |
author_sort |
Tamrin, Norhidayah |
title |
Readiness in Knowledge and Ability for Implementation of
Industrialised Building System (IBS) In Malaysian Construction Industry |
title_short |
Readiness in Knowledge and Ability for Implementation of
Industrialised Building System (IBS) In Malaysian Construction Industry |
title_full |
Readiness in Knowledge and Ability for Implementation of
Industrialised Building System (IBS) In Malaysian Construction Industry |
title_fullStr |
Readiness in Knowledge and Ability for Implementation of
Industrialised Building System (IBS) In Malaysian Construction Industry |
title_full_unstemmed |
Readiness in Knowledge and Ability for Implementation of
Industrialised Building System (IBS) In Malaysian Construction Industry |
title_sort |
readiness in knowledge and ability for implementation of
industrialised building system (ibs) in malaysian construction industry |
publishDate |
2016 |
url |
https://repo.uum.edu.my/id/eprint/31633/1/IIBS%2039%2009%2047-53%202016.pdf https://repo.uum.edu.my/id/eprint/31633/ https://www.researchgate.net/publication/312059691 |
_version_ |
1818837620800618496 |
score |
13.223943 |