Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry

The Malaysian construction industry is depreciating in comparison to other sectors where most of the construction supplies and materials have increased to unreasonable prices. This issue is bringing down the value of the projects which resulted in the construction players are not deriving any benefi...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdul Rahim, Syukran, Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar
Format: Article
Language:English
Published: Asian Research Publishing Network (ARPN) 2016
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/31629/1/JEAS%2010%2010%202016.pdf
https://repo.uum.edu.my/id/eprint/31629/
https://www.arpnjournals.com/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.31629
record_format eprints
spelling my.uum.repo.316292024-12-17T13:05:04Z https://repo.uum.edu.my/id/eprint/31629/ Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry Abdul Rahim, Syukran Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar HD28 Management. Industrial Management The Malaysian construction industry is depreciating in comparison to other sectors where most of the construction supplies and materials have increased to unreasonable prices. This issue is bringing down the value of the projects which resulted in the construction players are not deriving any benefit from the projects. This will further demoralise the construction players, in addition to the inherent problem of fragmentation issues in the construction which is already killing the industry. The current building method is no longer relevant to to the industry anymore due to the lack of controlling specifically on the subject of cost leaking.he other issues that are leading to cost leaking such as rework, delay and wastage, are also causing threats to the survival of organizations within the construction industry. Consequently, this paper through the literature review highlights fragmentation as the primary issue in the construction industry and suggests the Integrated Project Delivery (IPD) as the result of all those events that had been placed. Key words: Integrated Project Delivery (IPD) Malaysian Construction Industry Fragmentation issues Project Management Asian Research Publishing Network (ARPN) 2016 Article PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/31629/1/JEAS%2010%2010%202016.pdf Abdul Rahim, Syukran and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar (2016) Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry. ARPN Journal of Engineering and Applied Sciences, 10 (10). pp. 1-5. ISSN 1819-6608 https://www.arpnjournals.com/
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutional Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Abdul Rahim, Syukran
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
description The Malaysian construction industry is depreciating in comparison to other sectors where most of the construction supplies and materials have increased to unreasonable prices. This issue is bringing down the value of the projects which resulted in the construction players are not deriving any benefit from the projects. This will further demoralise the construction players, in addition to the inherent problem of fragmentation issues in the construction which is already killing the industry. The current building method is no longer relevant to to the industry anymore due to the lack of controlling specifically on the subject of cost leaking.he other issues that are leading to cost leaking such as rework, delay and wastage, are also causing threats to the survival of organizations within the construction industry. Consequently, this paper through the literature review highlights fragmentation as the primary issue in the construction industry and suggests the Integrated Project Delivery (IPD) as the result of all those events that had been placed. Key words: Integrated Project Delivery (IPD) Malaysian Construction Industry Fragmentation issues Project Management
format Article
author Abdul Rahim, Syukran
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
author_facet Abdul Rahim, Syukran
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
author_sort Abdul Rahim, Syukran
title Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
title_short Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
title_full Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
title_fullStr Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
title_full_unstemmed Integrated Project Delivery (IPD): A Collaborative Approach to Improve the Construction Industry
title_sort integrated project delivery (ipd): a collaborative approach to improve the construction industry
publisher Asian Research Publishing Network (ARPN)
publishDate 2016
url https://repo.uum.edu.my/id/eprint/31629/1/JEAS%2010%2010%202016.pdf
https://repo.uum.edu.my/id/eprint/31629/
https://www.arpnjournals.com/
_version_ 1818837620653817856
score 13.223943