A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and depende...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EconJournals
2016
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31621/1/IRMM%2006%20S08%20226-229%202016.pdf https://repo.uum.edu.my/id/eprint/31621/ https://econjournals.com/index.php/irmm/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.31621 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.316212024-12-16T15:44:02Z https://repo.uum.edu.my/id/eprint/31621/ A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects Othman, Mohd Zainudin Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Yaakob, Mazri Rofie, Mohamad Khadafi Md Zan, Zainal Ahmad Pozin, Mohd Affendi HD28 Management. Industrial Management The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and dependency on manual foreign labor, and (4) achieve the ultimate goal of reducing the overall cost of construction. Despite acknowledging its benefits, the construction industry is still not rapidly embracing IBS. This is mainly due to its traditional and conservative nature where anything new or different, faces implementation barriers. An investigation by some researchers identified that one of the main obstacles to IBS implementation in the Malaysian construction industry is related to poor integration among stakeholders involved during the design stage. Responding to the issue above, this research aims to counter this problem and help towards the betterment of the IBS Malaysian construction industry using an integrated design team delivery approach. Therefore, this paper discusses a strategy by the identifying key factors that are pertinent to improving the integration of design and construction activities and summarizes the recommendations from multiple case studies on the key factors towards effective integrated design team delivery EconJournals 2016 Article PeerReviewed application/pdf en cc4_by_nc_nd https://repo.uum.edu.my/id/eprint/31621/1/IRMM%2006%20S08%20226-229%202016.pdf Othman, Mohd Zainudin and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar and Yaakob, Mazri and Rofie, Mohamad Khadafi and Md Zan, Zainal and Ahmad Pozin, Mohd Affendi (2016) A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects. International Review of Management and Marketing, 6 (8). pp. 226-229. ISSN 2146-4405 https://econjournals.com/index.php/irmm/ |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutional Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Othman, Mohd Zainudin Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Yaakob, Mazri Rofie, Mohamad Khadafi Md Zan, Zainal Ahmad Pozin, Mohd Affendi A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects |
description |
The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and dependency on manual foreign labor, and (4) achieve the ultimate goal of reducing the overall cost of construction. Despite acknowledging its benefits, the construction industry is still not rapidly embracing IBS. This is mainly due to its traditional and conservative nature where anything new or different, faces implementation barriers. An investigation by some researchers identified that one of the main obstacles to IBS implementation in the Malaysian construction industry is related to poor integration among stakeholders involved during the design stage. Responding to the issue above, this research aims to counter this problem and help towards the betterment of the IBS Malaysian construction industry using an integrated design team delivery approach. Therefore, this paper discusses a strategy by the identifying key factors that are pertinent to improving the integration of design and construction activities and summarizes the recommendations from multiple case studies on the key factors towards effective integrated design team delivery |
format |
Article |
author |
Othman, Mohd Zainudin Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Yaakob, Mazri Rofie, Mohamad Khadafi Md Zan, Zainal Ahmad Pozin, Mohd Affendi |
author_facet |
Othman, Mohd Zainudin Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Yaakob, Mazri Rofie, Mohamad Khadafi Md Zan, Zainal Ahmad Pozin, Mohd Affendi |
author_sort |
Othman, Mohd Zainudin |
title |
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects |
title_short |
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects |
title_full |
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects |
title_fullStr |
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects |
title_full_unstemmed |
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects |
title_sort |
strategy towards team integration practice for improving the design and construction process in the malaysian industrialized building system projects |
publisher |
EconJournals |
publishDate |
2016 |
url |
https://repo.uum.edu.my/id/eprint/31621/1/IRMM%2006%20S08%20226-229%202016.pdf https://repo.uum.edu.my/id/eprint/31621/ https://econjournals.com/index.php/irmm/ |
_version_ |
1818837620381188096 |
score |
13.223943 |