Development A New Costing Structure in Product and Service Operation Using Time Driven Activity-Based Costing
In current practice of costing method in palm oil plantation, the method does not implement time equation so processing time determined by company is not in accordance with actual processing time in workstation. Then, the present implementation in academic library do not illustrate the correlation b...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
UUM Press
2022
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/29171/1/JTOM%2017%2001%202022%2011-26.pdf https://repo.uum.edu.my/id/eprint/29171/ https://doi.org/10.32890/jtom2022.17.1.2 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!