Waste reduction in body repair & paint area Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach
Toyota Nasmoco Ringroad Surakarta is a branchdealer that provides sales services, general repairs, body repair & paint, and spare parts. In the vehicle repair process, waste was found in the form of defect. The percentage of defect occurring from January to March 2020 shows an average of 85.2...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
UUMPRESS and Managed by STML
2020
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/28103/1/JTOM%2015%201%202020%2015%2026.pdf http://repo.uum.edu.my/28103/ http://e-journal.uum.edu.my/index.php/jtom/article/view/11132 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.28103 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.281032021-01-26T04:05:46Z http://repo.uum.edu.my/28103/ Waste reduction in body repair & paint area Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach Suhardi, Bambang Asariella Findya Octa, Pertiwi Rahmaniyah, Dwi Astuti HD28 Management. Industrial Management Toyota Nasmoco Ringroad Surakarta is a branchdealer that provides sales services, general repairs, body repair & paint, and spare parts. In the vehicle repair process, waste was found in the form of defect. The percentage of defect occurring from January to March 2020 shows an average of 85.22%. This study aims to identify critical waste defect and determine the factors that cause critical waste defect to occur and provide recommendations for improvements in order to reduce the waste that occurs in the area of body repair & paint. Efforts to reduce waste defects are carried out with a lean manufacturing approach. The research was carried out in three stages. The first stage begins with conducting a field study to identify problems. In the second stage, defect data is collected, which will be processed using Pareto diagrams so that the type of defect occurs most frequently. Furthermore, in the third stage, data processing begins with the identification of 9 wastes. Then identify the factors that cause waste using the fish bone diagram and the 5W + 1H method. Furthermore, the selected critical waste is processed using FMEA to identify systems that have a risk of failure which is indicated by the number of RPNs from the value rating of severity, occurrence, and detection. Based on the highest number of RPNs occurred in the polishing and reassuring sub-area of 210. Proposals for improvement were a box, poka-yoke, and Kamishibai designs. Therefore, it is hoped that the proposed repair method will reduce the risk of defect arising during the vehicle repair process. UUMPRESS and Managed by STML 2020 Article PeerReviewed application/pdf en http://repo.uum.edu.my/28103/1/JTOM%2015%201%202020%2015%2026.pdf Suhardi, Bambang and Asariella Findya Octa, Pertiwi and Rahmaniyah, Dwi Astuti (2020) Waste reduction in body repair & paint area Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach. Journal of Technology and Operations Management (JTOM), 15 (1). pp. 15-26. ISSN 2590-4175 http://e-journal.uum.edu.my/index.php/jtom/article/view/11132 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutional Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Suhardi, Bambang Asariella Findya Octa, Pertiwi Rahmaniyah, Dwi Astuti Waste reduction in body repair & paint area Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach |
description |
Toyota Nasmoco Ringroad Surakarta is a branchdealer that provides sales services,
general repairs, body repair & paint, and spare parts. In the vehicle repair process, waste
was found in the form of defect. The percentage of defect occurring from January to March
2020 shows an average of 85.22%. This study aims to identify critical waste defect and
determine the factors that cause critical waste defect to occur and provide recommendations for improvements in order to reduce the waste that occurs in the area of body repair & paint. Efforts to reduce waste defects are carried out with a lean manufacturing approach. The research was carried out in three stages. The first stage
begins with conducting a field study to identify problems. In the second stage, defect data
is collected, which will be processed using Pareto diagrams so that the type of defect occurs most frequently. Furthermore, in the third stage, data processing begins with the identification of 9 wastes. Then identify the factors that cause waste using the fish bone diagram and the 5W + 1H method. Furthermore, the selected critical waste is processed using FMEA to identify systems that have a risk of failure which is indicated by the number of RPNs from the value rating of severity, occurrence, and detection. Based on the highest
number of RPNs occurred in the polishing and reassuring sub-area of 210. Proposals for
improvement were a box, poka-yoke, and Kamishibai designs. Therefore, it is hoped that
the proposed repair method will reduce the risk of defect arising during the vehicle repair process. |
format |
Article |
author |
Suhardi, Bambang Asariella Findya Octa, Pertiwi Rahmaniyah, Dwi Astuti |
author_facet |
Suhardi, Bambang Asariella Findya Octa, Pertiwi Rahmaniyah, Dwi Astuti |
author_sort |
Suhardi, Bambang |
title |
Waste reduction in body repair & paint area
Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach |
title_short |
Waste reduction in body repair & paint area
Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach |
title_full |
Waste reduction in body repair & paint area
Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach |
title_fullStr |
Waste reduction in body repair & paint area
Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach |
title_full_unstemmed |
Waste reduction in body repair & paint area
Toyota Nasmoco Ringroad Sukarta with lean manufacturing approach |
title_sort |
waste reduction in body repair & paint area
toyota nasmoco ringroad sukarta with lean manufacturing approach |
publisher |
UUMPRESS and Managed by STML |
publishDate |
2020 |
url |
http://repo.uum.edu.my/28103/1/JTOM%2015%201%202020%2015%2026.pdf http://repo.uum.edu.my/28103/ http://e-journal.uum.edu.my/index.php/jtom/article/view/11132 |
_version_ |
1690373821799858176 |
score |
13.211869 |