Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Construction Research Institute of Malaysia
2014
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf http://repo.uum.edu.my/18854/ http://www.cream.my/publication/download-mcrj.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|