A proposed model in improve project cost and schedule predictability

PT. ABC Indonesia is facing a problem in executing the capital project.The cost and predictability of projects were found low as indicated by delay and overrun.According to the assessment conducted to projects that were executed in 2008-2012, the problem contributed to the low cost and schedule pre...

Full description

Saved in:
Bibliographic Details
Main Author: Kurniawan, Yuli
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15991/1/P46.pdf
http://repo.uum.edu.my/15991/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!