Optimization steam dispatching system at PT. ABC to enhance production performance

PT. ABC injects steam to the ground for reducing oil viscosity and enhancing oil recovery.Those steams are generated from Steam Generator at SS-1/2/3 and Heat Recovery Steam Generator at COGEN. One unit COGEN produce 100,000 BSPD to supply steam for north areas (Area X/Y/Z) and each year has mainte...

詳細記述

保存先:
書誌詳細
第一著者: Wardhana, Satria Yoelis
フォーマット: Conference or Workshop Item
言語:English
出版事項: 2014
主題:
オンライン・アクセス:http://repo.uum.edu.my/15962/1/P33.pdf
http://repo.uum.edu.my/15962/
http://stmlportal.net/ictom04/TOC.html
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!

類似資料