Optimization steam dispatching system at PT. ABC to enhance production performance

PT. ABC injects steam to the ground for reducing oil viscosity and enhancing oil recovery.Those steams are generated from Steam Generator at SS-1/2/3 and Heat Recovery Steam Generator at COGEN. One unit COGEN produce 100,000 BSPD to supply steam for north areas (Area X/Y/Z) and each year has mainte...

全面介绍

Saved in:
书目详细资料
主要作者: Wardhana, Satria Yoelis
格式: Conference or Workshop Item
语言:English
出版: 2014
主题:
在线阅读:http://repo.uum.edu.my/15962/1/P33.pdf
http://repo.uum.edu.my/15962/
http://stmlportal.net/ictom04/TOC.html
标签: 添加标签
没有标签, 成为第一个标记此记录!