A study of potential load bearing masonry (LBM) system in Malaysia construction industry
To overcome the problems in increasing of material prices, land prices, shortage of shilled workers, equipping low cost housing demands and maintained the cost of the constructing at an affordable price, there is a need to find the alternative solution for constructing method.The use of the load b...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/11741/1/Ram.pdf http://repo.uum.edu.my/11741/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.11741 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.117412016-04-19T01:54:08Z http://repo.uum.edu.my/11741/ A study of potential load bearing masonry (LBM) system in Malaysia construction industry Ramli, N. A. Abdullah, Che Sobry Mohd Nawi, Mohd Nasrun TH Building construction To overcome the problems in increasing of material prices, land prices, shortage of shilled workers, equipping low cost housing demands and maintained the cost of the constructing at an affordable price, there is a need to find the alternative solution for constructing method.The use of the load bearing masonry system (LBM) has been identified as a sustainable and an effective alternative method for the construction industry.'She system offers several advantages in term of cost and speed of the construction, durability, strength, environmentally friendly practices and aesthetic qualities.Despite these advantages, unfortunately, this system has not been widely used in Malaysia compared to reinforced concrete (RC)frame construction.Therefore, this paper aims to discuss the advantages and potential of the system implementation to Malaysia construction industry in the future. 2013 Conference or Workshop Item NonPeerReviewed application/pdf en http://repo.uum.edu.my/11741/1/Ram.pdf Ramli, N. A. and Abdullah, Che Sobry and Mohd Nawi, Mohd Nasrun (2013) A study of potential load bearing masonry (LBM) system in Malaysia construction industry. In: 3rd International Building Control Conference (IBCC), 21st November 2013, Royal Chulan Hotel, Kuala Lumpur, Malaysia. (Unpublished) |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Ramli, N. A. Abdullah, Che Sobry Mohd Nawi, Mohd Nasrun A study of potential load bearing masonry (LBM) system in Malaysia construction industry |
description |
To overcome the problems in increasing of material prices, land prices, shortage of
shilled workers, equipping low cost housing
demands and maintained the cost of the constructing at an affordable price, there is a need to find the alternative solution for constructing method.The use of the load bearing masonry system (LBM) has been
identified as a sustainable and an effective alternative method for the construction
industry.'She system offers several advantages in term of cost and speed
of the construction, durability, strength,
environmentally friendly practices and aesthetic qualities.Despite these advantages, unfortunately, this system has not been widely
used in Malaysia compared to reinforced concrete (RC)frame construction.Therefore, this paper aims to discuss the advantages and potential of the system implementation to Malaysia construction industry in the future. |
format |
Conference or Workshop Item |
author |
Ramli, N. A. Abdullah, Che Sobry Mohd Nawi, Mohd Nasrun |
author_facet |
Ramli, N. A. Abdullah, Che Sobry Mohd Nawi, Mohd Nasrun |
author_sort |
Ramli, N. A. |
title |
A study of potential load bearing masonry (LBM) system in Malaysia construction industry |
title_short |
A study of potential load bearing masonry (LBM) system in Malaysia construction industry |
title_full |
A study of potential load bearing masonry (LBM) system in Malaysia construction industry |
title_fullStr |
A study of potential load bearing masonry (LBM) system in Malaysia construction industry |
title_full_unstemmed |
A study of potential load bearing masonry (LBM) system in Malaysia construction industry |
title_sort |
study of potential load bearing masonry (lbm) system in malaysia construction industry |
publishDate |
2013 |
url |
http://repo.uum.edu.my/11741/1/Ram.pdf http://repo.uum.edu.my/11741/ |
_version_ |
1644280724886388736 |
score |
13.211869 |