Improving project disbursement process in a Malaysian shipyard

This study is about the deployment of Business Process Reengineering (BPR) in a Shipyard to resolve the problem of the project disbursement process that has caused a significant delay in approving a statement of work progress (SOP). A revamping effort to reduce the SOP approval cycle time and gain a...

全面介绍

Saved in:
书目详细资料
主要作者: Azman, Ismail
格式: Thesis
语言:English
English
出版: 2018
主题:
在线阅读:https://etd.uum.edu.my/7926/1/Depositpermission_s95119.pdf
https://etd.uum.edu.my/7926/2/s95119_01.pdf
https://etd.uum.edu.my/7926/
https://sierra.uum.edu.my/record=b1698960~S1
标签: 添加标签
没有标签, 成为第一个标记此记录!
id my.uum.etd.7926
record_format eprints
spelling my.uum.etd.79262021-08-09T04:50:56Z https://etd.uum.edu.my/7926/ Improving project disbursement process in a Malaysian shipyard Azman, Ismail HD28-70 Management. Industrial Management VM Naval architecture. Shipbuilding. Marine engineering This study is about the deployment of Business Process Reengineering (BPR) in a Shipyard to resolve the problem of the project disbursement process that has caused a significant delay in approving a statement of work progress (SOP). A revamping effort to reduce the SOP approval cycle time and gain a cost saving from the process is a target to be achieved. The research used a qualitative method with the interactive action research cycle to revamp the project disbursement process. To assess the revamping exercise, 946 SOPs from three ship repair projects were elected and analyzed. Each SOP was grouped based on how long it took to get the approval: (a) 0 - 2 days, (b) 3 - 4 days, (c) 5 - 6 days, and (d) more than 7 days. To reduce ERTC, a Force Field Analysis (FFA) by the BPR team members was conducted. Twelve interviewees were selected from the Shipyard employees and subcontractors to give their response to the BPR deployment and ERTC. The analysis focused on the influence of the BPR CSF influence on employees' perceived benefit of change (PBC), organizational commitment (OC). involvement in change (TIC), and attitude towards change (ATC). The findings showed that the Shipyard managed to reduce the SOP approval cycle time up to 86%, gained a cost saving from the improvement process between 31% and 61%, and reduced ERTC using the BPR CSFs. The results of this research will enable the Shipyard to resolve its problem of the project disbursement process by eliminating the delay in approving an SOP and gaining a cost saving from the revamping process. The results help to understand further how to use BPR CSFs during project implementation to reduce ERTC and further extend the relationship between BPR, change theory, and resistance to change (RTC). 2018 Thesis NonPeerReviewed text en https://etd.uum.edu.my/7926/1/Depositpermission_s95119.pdf text en https://etd.uum.edu.my/7926/2/s95119_01.pdf Azman, Ismail (2018) Improving project disbursement process in a Malaysian shipyard. PhD. thesis, Universiti Utara Malaysia. https://sierra.uum.edu.my/record=b1698960~S1
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
url_provider http://etd.uum.edu.my/
language English
English
topic HD28-70 Management. Industrial Management
VM Naval architecture. Shipbuilding. Marine engineering
spellingShingle HD28-70 Management. Industrial Management
VM Naval architecture. Shipbuilding. Marine engineering
Azman, Ismail
Improving project disbursement process in a Malaysian shipyard
description This study is about the deployment of Business Process Reengineering (BPR) in a Shipyard to resolve the problem of the project disbursement process that has caused a significant delay in approving a statement of work progress (SOP). A revamping effort to reduce the SOP approval cycle time and gain a cost saving from the process is a target to be achieved. The research used a qualitative method with the interactive action research cycle to revamp the project disbursement process. To assess the revamping exercise, 946 SOPs from three ship repair projects were elected and analyzed. Each SOP was grouped based on how long it took to get the approval: (a) 0 - 2 days, (b) 3 - 4 days, (c) 5 - 6 days, and (d) more than 7 days. To reduce ERTC, a Force Field Analysis (FFA) by the BPR team members was conducted. Twelve interviewees were selected from the Shipyard employees and subcontractors to give their response to the BPR deployment and ERTC. The analysis focused on the influence of the BPR CSF influence on employees' perceived benefit of change (PBC), organizational commitment (OC). involvement in change (TIC), and attitude towards change (ATC). The findings showed that the Shipyard managed to reduce the SOP approval cycle time up to 86%, gained a cost saving from the improvement process between 31% and 61%, and reduced ERTC using the BPR CSFs. The results of this research will enable the Shipyard to resolve its problem of the project disbursement process by eliminating the delay in approving an SOP and gaining a cost saving from the revamping process. The results help to understand further how to use BPR CSFs during project implementation to reduce ERTC and further extend the relationship between BPR, change theory, and resistance to change (RTC).
format Thesis
author Azman, Ismail
author_facet Azman, Ismail
author_sort Azman, Ismail
title Improving project disbursement process in a Malaysian shipyard
title_short Improving project disbursement process in a Malaysian shipyard
title_full Improving project disbursement process in a Malaysian shipyard
title_fullStr Improving project disbursement process in a Malaysian shipyard
title_full_unstemmed Improving project disbursement process in a Malaysian shipyard
title_sort improving project disbursement process in a malaysian shipyard
publishDate 2018
url https://etd.uum.edu.my/7926/1/Depositpermission_s95119.pdf
https://etd.uum.edu.my/7926/2/s95119_01.pdf
https://etd.uum.edu.my/7926/
https://sierra.uum.edu.my/record=b1698960~S1
_version_ 1707768044231589888
score 13.251813