An Integration of Rank Order Centroid, Modified Analytical Hierarchy Process and 0-1 Integer Programming in Solving A Facility Location Problem
Hadhramout province is the major producer of dates in The Republic of Yemen. Despite producing substantial quantity and quality of dates, the business losses are still high. The situation worsens with the widespread of the black market activities. Recently, the Yemeni government has issued an agreem...
Saved in:
Main Author: | Balhuwaisl, Mohammed Ahmed Salem |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2013
|
Subjects: | |
Online Access: | https://etd.uum.edu.my/3862/1/s90773.pdf https://etd.uum.edu.my/3862/7/s90773.pdf https://etd.uum.edu.my/3862/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fuzzy analytic hierarchy process using intuitive vectorial centroid for eco-friendly car selection
by: Adam Shariff Adli, Aminuddin, et al.
Published: (2019) -
Ranking method for Z-numbers based on centroid-point
by: Abdullahi, Mujahid, et al.
Published: (2021) -
Optimizing the preference of student-lecturer allocation problem using analytical hierarchy process and integer programming
by: Faudzi, S., et al.
Published: (2020) -
Integrating analytic hierarchy process with integer programming to efficiently model spectrum demands
by: Ramli, Razamin, et al.
Published: (2011) -
Assignment of spectrum demands by merits via analytic hierarchy process and integer programming
by: Ramli, Razamin, et al.
Published: (2013)