Reliability assessment of repairable system through expert elicitation
The effect of unplanned downtime cannot be more over emphasized which can range from minor disturbance to catastrophic to plant operation. As much as possible the occurrence of failure has to be reduced or eliminated by putting more focus on planned downtime. This initiative can be accomplished by p...
Saved in:
Main Authors: | , , |
---|---|
格式: | Conference or Workshop Item |
出版: |
EDP Sciences
2014
|
在線閱讀: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84905013811&doi=10.1051%2fmatecconf%2f20141305008&partnerID=40&md5=c29fae27c27c970e429c02c46ec60ee9 http://eprints.utp.edu.my/32246/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|