Factors affecting fill removal from horizontal well during colied tubing cleanout operation
Coiled Tubing (CT) is extensively used in oil industry to clean the wellbore to increase the productivity of oil/gas well by removing the fill/sand downhole. Well cleanup operation for low bottom hole pressure is problematic and common cleanout fluids are not effective as a circulation fluid due to...
Saved in:
Main Authors: | Pao, W.K., Khan, J.A. |
---|---|
Format: | Conference or Workshop Item |
Published: |
EDP Sciences
2014
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84905019268&doi=10.1051%2fmatecconf%2f20141302024&partnerID=40&md5=2d85e78a1f2b7917448483be13de3d93 http://eprints.utp.edu.my/32235/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effect of different qualities of foam on fill particle transport in horizontal well cleanup operation using coiled tubing
by: Khan, J.A., et al.
Published: (2014) -
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing
by: Khan, Javed A, et al.
Published: (2013) - Fill removal with foam in horizontal well cleaning in coiled tubing
-
Horizontal Well Cleanup Operation using Foam in Different Coiled Tubing/Annulus Diameter Ratios
by: Khan, Javed, et al.
Published: (2013) -
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING
by: KHAN, JAVED AKBAR
Published: (2013)