A Comprehensive Field Investigation for Rehabilitation of an Embankment Pond
Planning and implementation of a comprehensive field investigation for the rehabilitation of an embankment pond, damaged by bed erosion and liner rupture, are discussed. The pond can store 1.5×106 m3 water and is formed by a peripheral 16-m-high embankment. It regulates the water issuing from the ta...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/3098/1/Pergau_Paper_at_JFIC_2010.pdf http://eprints.utp.edu.my/3098/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!