A Comprehensive Field Investigation for Rehabilitation of an Embankment Pond

Planning and implementation of a comprehensive field investigation for the rehabilitation of an embankment pond, damaged by bed erosion and liner rupture, are discussed. The pond can store 1.5×106 m3 water and is formed by a peripheral 16-m-high embankment. It regulates the water issuing from the ta...

Full description

Saved in:
Bibliographic Details
Main Authors: Saiedi, Saied, Hee Min, Teh, Mustaffa, Zahiraniza, Nabilah , A.B., Kalaikumar, V.
Format: Conference or Workshop Item
Published: 2010
Subjects:
Online Access:http://eprints.utp.edu.my/3098/1/Pergau_Paper_at_JFIC_2010.pdf
http://eprints.utp.edu.my/3098/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first