Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R
Travelling is one of the basic necessities of every human being. It is a natural behavior of every traveler to desire �arrival as planned� when using any transportation system. In order to fulfill this desire, travelling through Bus is one of the most selected options. The passenger�s decision...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Published: |
Research India Publications
2016
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84959334923&partnerID=40&md5=cc7797eb8e73af20feeeb013e73fa29e http://eprints.utp.edu.my/25569/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utp.eprints.25569 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.255692021-08-27T09:58:55Z Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R Rafique, M.Z. Rahman, M.N.A. Saibani, N. Arsad, N. Mughal, I.A. Hanif, S. Zafar, M. Travelling is one of the basic necessities of every human being. It is a natural behavior of every traveler to desire �arrival as planned� when using any transportation system. In order to fulfill this desire, travelling through Bus is one of the most selected options. The passenger�s decision regarding selection of bus services entirely depends upon service quality. It has been observed that, if the bus service quality is poor, specifically in terms of timing, then it results in fair chances of loss of ridership because of annoyance due to delays which results in anxiety. The focus of this research work is to measure quality of bus transport system by considering one of famous bus service as a case study. The aim is to utilize tool named as �Control charts� and �Gauge R & R� to check its quality and services. A detailed X-bar and R-bar charts are produced based on frequency of timing of buses from one station to another and on the same sample the gauge R & R results in 24 which clearly indicates that the selected bus service is running in control situation due to utilization of modern technologies and recommends use of modern technologies to other bus services. However factors like uncertainty of road traffic and sudden accidents on road obviates to achieve gauge R & R value within 10. © Research India Publications. Research India Publications 2016 Article NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-84959334923&partnerID=40&md5=cc7797eb8e73af20feeeb013e73fa29e Rafique, M.Z. and Rahman, M.N.A. and Saibani, N. and Arsad, N. and Mughal, I.A. and Hanif, S. and Zafar, M. (2016) Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R. International Journal of Applied Engineering Research, 11 (1). pp. 101-104. http://eprints.utp.edu.my/25569/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
description |
Travelling is one of the basic necessities of every human being. It is a natural behavior of every traveler to desire �arrival as planned� when using any transportation system. In order to fulfill this desire, travelling through Bus is one of the most selected options. The passenger�s decision regarding selection of bus services entirely depends upon service quality. It has been observed that, if the bus service quality is poor, specifically in terms of timing, then it results in fair chances of loss of ridership because of annoyance due to delays which results in anxiety. The focus of this research work is to measure quality of bus transport system by considering one of famous bus service as a case study. The aim is to utilize tool named as �Control charts� and �Gauge R & R� to check its quality and services. A detailed X-bar and R-bar charts are produced based on frequency of timing of buses from one station to another and on the same sample the gauge R & R results in 24 which clearly indicates that the selected bus service is running in control situation due to utilization of modern technologies and recommends use of modern technologies to other bus services. However factors like uncertainty of road traffic and sudden accidents on road obviates to achieve gauge R & R value within 10. © Research India Publications. |
format |
Article |
author |
Rafique, M.Z. Rahman, M.N.A. Saibani, N. Arsad, N. Mughal, I.A. Hanif, S. Zafar, M. |
spellingShingle |
Rafique, M.Z. Rahman, M.N.A. Saibani, N. Arsad, N. Mughal, I.A. Hanif, S. Zafar, M. Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R |
author_facet |
Rafique, M.Z. Rahman, M.N.A. Saibani, N. Arsad, N. Mughal, I.A. Hanif, S. Zafar, M. |
author_sort |
Rafique, M.Z. |
title |
Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R |
title_short |
Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R |
title_full |
Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R |
title_fullStr |
Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R |
title_full_unstemmed |
Quality check for customer benefit in bus transport system through statistical control charts and gauge R & R |
title_sort |
quality check for customer benefit in bus transport system through statistical control charts and gauge r & r |
publisher |
Research India Publications |
publishDate |
2016 |
url |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84959334923&partnerID=40&md5=cc7797eb8e73af20feeeb013e73fa29e http://eprints.utp.edu.my/25569/ |
_version_ |
1738656748625985536 |
score |
13.211869 |