Reliability assessment of the vertical well system subjected to erosion and tubing failure

Tubing is part of a typical vertical well system which functions to transport hydrocarbon from the producing formations to the field surface facilities for processing. With its exposure to the harsh sandstone reservoir environment, erosion is likely to be present in the tubing. Regardless of this, t...

全面介绍

Saved in:
书目详细资料
Main Authors: Mustaffa, Z., Halim, A.H.A., Kim, D.K., van Gelder, P.H.A.J.M.
格式: Article
出版: Taylor and Francis Ltd. 2021
在线阅读:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85077900371&doi=10.1080%2f17445302.2019.1710929&partnerID=40&md5=60e978b4d38d76fc75269c42734d1ae0
http://eprints.utp.edu.my/23895/
标签: 添加标签
没有标签, 成为第一个标记此记录!