Reliability assessment of the vertical well system subjected to erosion and tubing failure
Tubing is part of a typical vertical well system which functions to transport hydrocarbon from the producing formations to the field surface facilities for processing. With its exposure to the harsh sandstone reservoir environment, erosion is likely to be present in the tubing. Regardless of this, t...
Saved in:
Main Authors: | , , , |
---|---|
格式: | Article |
出版: |
Taylor and Francis Ltd.
2021
|
在线阅读: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85077900371&doi=10.1080%2f17445302.2019.1710929&partnerID=40&md5=60e978b4d38d76fc75269c42734d1ae0 http://eprints.utp.edu.my/23895/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|