Case Study of sewerage pipe installation using Pipe Jacking and Micro-tunnelling Boring Machine (MTBM) in Ipoh

This paper provides a review of the sewerage pipe installations near Jalan Pengkalan Perindustrian, Ipoh Perak using pipe jacking and micro-tunneling methods. The alignment of the pipe installation involving tunneling and jacking beneath the KTMB (Kereta Api Tanah Melayu Berhad) railway track with 1...

Full description

Saved in:
Bibliographic Details
Main Authors: Aiman, M.S., Hadri, M., Mohamad, H.
Format: Conference or Workshop Item
Published: IOP Publishing Ltd 2020
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85098510661&doi=10.1088%2f1757-899X%2f932%2f1%2f012047&partnerID=40&md5=ae29585eb52bc9fc72ae9819f7edf3dd
http://eprints.utp.edu.my/23064/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items