Risk factors influencing time and cost overrun in multiple D&B projects in Malaysia: A case study
Currently Design and Build (D&B) has gained popularity in the construction industry due to its attractive financial aspects. The development projects are implemented by D&B because of its special nature, crucial time requirements and size. Many D&B projects ended in the hands of con...
Saved in:
Main Authors: | C.T, Ramanathan, Sambu Potty, Narayanan, Idrus, Arazi |
---|---|
Format: | Conference or Workshop Item |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/11027/1/06118037_IEEM_rama.pdf http://eprints.utp.edu.my/11027/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Case study and Survey on Time and Cost
overrun of Multiple D&B Projects
by: Sambu Potty, Narayanan, et al.
Published: (2011) -
Approaches in management of Construction delays and cost overrun of Multiple D&B Projects in Sabah
by: C.T, Ramanathan, et al.
Published: (2011) -
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects
by: B. Idrus, Arazi, et al.
Published: (2011) -
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
by: C.T, Ramanathan, et al.
Published: (2014) -
Analysis of time and cost overrun in Malaysian construction
by: Sambu Potty, Narayanan, et al.
Published: (2012)