Effect of ground vibration due to blasting activity in large section tunnel close to Pantai Timur Highway LPT 1
Tunnel blast activity for East Cost Railway Project is close to the Pantai Timur Highway at Kuantan, Pahang. Due to the constant rains and humid conditions in the tropical area, rock mass is subjected to severe weathering. This zone is characterized by a thick weathering profile, which necessitates...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2022
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/98535/ http://dx.doi.org/10.1007/978-981-16-9770-8_12 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!