Machine learning model for delay risk assessment in tall building projects
Risky projects such as tall buildings have suffered an alarming rate of increase in delays and total abandonment. Though numerous delay studies predominate, what is lacking is constructive research to develop tools and techniques to wrestle the inherent problem. Consequently, this paper presents the...
Saved in:
Main Authors: | Sanni-Anibire, M. O., Zin, R. M., Olatunji, S. O. |
---|---|
Format: | Article |
Published: |
Taylor and Francis Ltd.
2020
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/93117/ http://dx.doi.org/10.1080/15623599.2020.1768326 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Developing a machine learning model to predict the construction duration of tall building projects
by: Sanni-Anibire, Muizz O., et al.
Published: (2021) -
Developing a preliminary cost estimation model for tall buildings based on machine learning
by: Anibire, M. O. S., et al.
Published: (2021) -
A machine learning-based framework for delay risk mitigation in building projects
by: Sanni-Anibire, Muizz Oladapo
Published: (2021) -
Machine learning - based framework for construction delay mitigation
by: Sanni-Anibire, M. O., et al.
Published: (2021) -
Causes of delay in the global construction industry: a meta analytical review
by: Sanni-Anibire, M. O., et al.
Published: (2020)