Analysis of air flow around the painting line for dust reduction: an experimental and numerical study

The repair of paint work defects in the painting production process is done by running the parts through the painting process again. It is done together with the requisite quality control routines and involves a very large proportion of the operating costs. The dust defect which ranges between 40% t...

Full description

Saved in:
Bibliographic Details
Main Authors: Yosri, M. H., Muhamad, P., Quen, L. K., Yatim, N. M.
Format: Article
Published: Penerbit Akademia Baru 2020
Subjects:
Online Access:http://eprints.utm.my/id/eprint/93088/
http://dx.doi.org/10.37934/cfdl.12.9.3650
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items