An investigation into the potential hindering factors of implementing performance information procurement system in Nigeria
Notably in the construction industry, procurement is evidently important and cannot be played down because it constitutes every phase of a project delivery system. The low-bid system has remained the most popular procurement system globally. In Nigeria, it lacks transparency and accountability. Ther...
Saved in:
Main Authors: | Buba, G. S. P., Hamid, R. A., Ramly, Z. M. |
---|---|
Format: | Article |
Published: |
Universiti Putra Malaysia Press
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/89394/ http://www.pertanika.upm.edu.my/Pertanika%20PAPERS/JST%20Vol.%2027%20(3)%20Jul.%202019/11%20JST-1246-2018.pdf. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The potential of design and build procurement method implementation in the directorate of enviromental sanitation development Indonesia
by: Muhammad Iqbal, Muhammad Iqbal
Published: (2015) -
The factors concerning procurement selection for building information modeling (bim) based project
by: Tajul Ariffin, Hamizah Liyana, et al.
Published: (2018) -
Towards the implementation of performance information procurement system in the Nigerian construction industry
by: Buba, Simon Peter Gumgaro
Published: (2019) -
The legal aspect of procurement system - doctrine of variation order with respect to design and build procurement system
by: Abdul Majid, Masidah
Published: (2011) -
Critical success factors for public housing projects in developing countries: a case study of Nigeria
by: Muhammad, Z., et al.
Published: (2017)