Work breakdown structure application for man-hours calculation in hull construction shipbuilding in Malaysia
In Malaysia, the majority of oil & gas platform construction use fixed type substructure such as jacket type platform. To date, only one Semi-FPS has been constructed in Malaysia involving complex and challenging issues in the construction of hull substructure. Oil & gas project managers hav...
Saved in:
Main Authors: | Wan Abd Rahman, W. A. Z., Mohd. Zaki, N. I., Abu Husain, M. K. |
---|---|
Format: | Article |
Language: | English |
Published: |
Cogent OA
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/88789/1/NoorIrzaZaki2019_WorkBreakdownStructureApplication.pdf http://eprints.utm.my/id/eprint/88789/ http://www.dx.doi.org/10.1080/23311916.2019.1599524 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A review of work breakdown structure and man-hours estimation method used in shipbuilding production
by: Rahman, W. A. Z. W. A., et al.
Published: (2019) -
The Correlation Of Shipyard Practices And Shipyard Performance In Relation To Hull's Block Construction In A Typical Malaysian Shipbuilding.
by: Muhammad Ikhwan Bin Abdul Razak
Published: (2014) -
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2005) -
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2004) -
Productivity measurement in Malaysia shipbuilding industry
by: Roslee, Ahmad Azmeer
Published: (2009)