Next generation intelligent completions for multi-stacked brownfield in Malaysia

Multi-stacked brownfield in Malaysia is known to have zonal contrast reservoir pressure and water cut. Commingled production without any flow control such as conventional on-off sliding sleeve will induce cross flow of production from a high pressure reservoir to lower pressure reservoir which disab...

Full description

Saved in:
Bibliographic Details
Main Author: P. Mosar, Nur Faizah
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/86208/1/NurFaizahPMosarMFChE2019.pdf
http://eprints.utm.my/id/eprint/86208/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131625
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.86208
record_format eprints
spelling my.utm.862082020-08-30T09:07:51Z http://eprints.utm.my/id/eprint/86208/ Next generation intelligent completions for multi-stacked brownfield in Malaysia P. Mosar, Nur Faizah TP Chemical technology Multi-stacked brownfield in Malaysia is known to have zonal contrast reservoir pressure and water cut. Commingled production without any flow control such as conventional on-off sliding sleeve will induce cross flow of production from a high pressure reservoir to lower pressure reservoir which disables optimum oil production. Having high zonal water cut contrast will cause early or excessive water production translates to deferred oil production. To pro-actively prevent these occurrences, adaptation of intelligent completion components such as Permanent Downhole Gauge (PDG) and surface-controlled Flow Control Valve (FCV) can be used. Downhole FCV choke is designed to cater for the dynamic changes of reservoir properties predicted over well life. In order to standardize the FCV choke sizing by well or by campaign, the choke sizing will be averaged to fit for all layers which is not the ultimate optimized design for maximum oil production. Latest in market today, electrical driven infinite position FCV is the solution to conventional hydraulic actuated FCV. Having infinite position enables optimized choke sizing for all reservoir layers and flexible to tackle uncertainties and dynamic changes of reservoir properties over time which enables the ultimate optimum oil production and water cut reduction. Besides choke sizing, deployment method and operating method also contribute to installation and operating efficiency. Conventional multi-position FCVs in market today are either fully hydraulic operated or electro-hydraulic operated which require hydraulic pump units at surface to enable pressuring up hydraulic control lines to change the position of FCV. It is also time consuming during deployment due to the requirement of electrical splicing, hydraulic splicing and FCV actuation sequence. Infinite position FCV is electrically operated using single downhole cable that can be multi-dropped to more than 25 FCV which reduces deployment time. With WellWatcher Advisor software that provides real time optimization features, operating efficiency is improved significantly with infinite position FCV as compared to conventional multi-position FCV and on-off sliding sleeve. 2019 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/86208/1/NurFaizahPMosarMFChE2019.pdf P. Mosar, Nur Faizah (2019) Next generation intelligent completions for multi-stacked brownfield in Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Chemical & Energy Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131625
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TP Chemical technology
spellingShingle TP Chemical technology
P. Mosar, Nur Faizah
Next generation intelligent completions for multi-stacked brownfield in Malaysia
description Multi-stacked brownfield in Malaysia is known to have zonal contrast reservoir pressure and water cut. Commingled production without any flow control such as conventional on-off sliding sleeve will induce cross flow of production from a high pressure reservoir to lower pressure reservoir which disables optimum oil production. Having high zonal water cut contrast will cause early or excessive water production translates to deferred oil production. To pro-actively prevent these occurrences, adaptation of intelligent completion components such as Permanent Downhole Gauge (PDG) and surface-controlled Flow Control Valve (FCV) can be used. Downhole FCV choke is designed to cater for the dynamic changes of reservoir properties predicted over well life. In order to standardize the FCV choke sizing by well or by campaign, the choke sizing will be averaged to fit for all layers which is not the ultimate optimized design for maximum oil production. Latest in market today, electrical driven infinite position FCV is the solution to conventional hydraulic actuated FCV. Having infinite position enables optimized choke sizing for all reservoir layers and flexible to tackle uncertainties and dynamic changes of reservoir properties over time which enables the ultimate optimum oil production and water cut reduction. Besides choke sizing, deployment method and operating method also contribute to installation and operating efficiency. Conventional multi-position FCVs in market today are either fully hydraulic operated or electro-hydraulic operated which require hydraulic pump units at surface to enable pressuring up hydraulic control lines to change the position of FCV. It is also time consuming during deployment due to the requirement of electrical splicing, hydraulic splicing and FCV actuation sequence. Infinite position FCV is electrically operated using single downhole cable that can be multi-dropped to more than 25 FCV which reduces deployment time. With WellWatcher Advisor software that provides real time optimization features, operating efficiency is improved significantly with infinite position FCV as compared to conventional multi-position FCV and on-off sliding sleeve.
format Thesis
author P. Mosar, Nur Faizah
author_facet P. Mosar, Nur Faizah
author_sort P. Mosar, Nur Faizah
title Next generation intelligent completions for multi-stacked brownfield in Malaysia
title_short Next generation intelligent completions for multi-stacked brownfield in Malaysia
title_full Next generation intelligent completions for multi-stacked brownfield in Malaysia
title_fullStr Next generation intelligent completions for multi-stacked brownfield in Malaysia
title_full_unstemmed Next generation intelligent completions for multi-stacked brownfield in Malaysia
title_sort next generation intelligent completions for multi-stacked brownfield in malaysia
publishDate 2019
url http://eprints.utm.my/id/eprint/86208/1/NurFaizahPMosarMFChE2019.pdf
http://eprints.utm.my/id/eprint/86208/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131625
_version_ 1677781146124943360
score 13.211869