Partial replacement of normal sand with garnet waste for bedding sand layer of concrete block pavement
Highway construction use river sand as a part of the materials. Due to fast developments, normal sand demand is increase and over exploited in construction. The increase in rate leads to increase in demand for raw materials which in turn leads to price hike of raw materials. Therefore this research...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2017
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/86031/1/MohdZawawivAzizMFKA2017.pdf http://eprints.utm.my/id/eprint/86031/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:132651 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|