Partial replacement of normal sand with garnet waste for bedding sand layer of concrete block pavement

Highway construction use river sand as a part of the materials. Due to fast developments, normal sand demand is increase and over exploited in construction. The increase in rate leads to increase in demand for raw materials which in turn leads to price hike of raw materials. Therefore this research...

全面介绍

Saved in:
书目详细资料
主要作者: Aziz, Mohd. Zawawiv
格式: Thesis
语言:English
出版: 2017
主题:
在线阅读:http://eprints.utm.my/id/eprint/86031/1/MohdZawawivAzizMFKA2017.pdf
http://eprints.utm.my/id/eprint/86031/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:132651
标签: 添加标签
没有标签, 成为第一个标记此记录!