Application and design of transition piled embankment with surcharged prefabricated vertical drain intersection over soft ground
Lately numerous ground treatments are being embraced as the structural approach to regulate the total settlement and differential settlement which is the root of the undulating road problem. A piled embankment is commonly adopted to control the total and differential settlements. While a vertical dr...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Springer Verlag
2018
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/85707/ http://dx.doi.org/10.1007/s13369-017-2628-6 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|