Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry

Prefabricated Pre-finished Volumetric Construction (PPVC) is the advanced modular construction technology introduced by Singapore Building and Construction Authority (BCA) to promote a modern practices in construction sector which rectifying the fragmentation of construction industries towards highe...

Full description

Saved in:
Bibliographic Details
Main Author: Loh, Seng Yap
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81091/1/LohSengYapMSKA2019.pdf
http://eprints.utm.my/id/eprint/81091/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125161
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.81091
record_format eprints
spelling my.utm.810912019-07-24T03:09:33Z http://eprints.utm.my/id/eprint/81091/ Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry Loh, Seng Yap TA Engineering (General). Civil engineering (General) Prefabricated Pre-finished Volumetric Construction (PPVC) is the advanced modular construction technology introduced by Singapore Building and Construction Authority (BCA) to promote a modern practices in construction sector which rectifying the fragmentation of construction industries towards higher productivity and more efficiency in project delivery. PPVC is an innovative approach to replace the traditional on-site construction method which construct a building using modular units away from the physical site but into a controlled factory environment. The adoption of PPVC has a significant solution to tackle the current level of quality, workmanship, productivity, non-environment construction, unaffordable housing, lacking on-site safety awareness, construction wastage and excessive reliance on unskilled foreign labors associated with conventional construction methods. In Malaysian, PPVC still lagging far behind in the development of Malaysian construction industry. The effectiveness of using PPVC can reduce the number of on-site contractors, increase the efficiencies in the use of resource and minimize the construction waste as well as reduce the overall of construction cost and durations. As a result, the aims of this study are to investigate the key factors affecting the adaptation of PPVC in Malaysia Construction Industry and thus recommend a criteria of feasible mitigation strategies in order to increase the possibility of using PPVC in the future development of Malaysian industry. To achieve these goals, questionnaire was administered by goggle survey form and distributed to industry experts who had working experience in the building industry. A total of 63 responses was received in this survey. Lastly, the results showed that highest number of respondents agreed that the effectiveness of using PPVC were “reduce the overall construction time”, “reduce on-site manpower and equipment requirement”, “better quality of workmanship, efficiency and productivity”. Results also implied that the top three important factors were “lacking experiences of current contractors, subcontractor on PPVC method”, “lacking PPVC of design experience, technical & installation” and “require high operation for capacities of heavy lift crane”. It also revealed the three effective mitigation strategies were “the use of Building Information Modelling (BIM) to tackle the building modular construction and coordination”, “intense coordination to ensure work sequence with minimal delays” and “early involvement of contractors and suppliers / manufacturers during the design phase of the project”. Moreover, there are significant risk on using PPVC as the reliability is much harder to guarantee than conventional construction method. PPVC can be very beneficial to a project, but only if everyone involved has the proper experience and ability to perform such activities. This study contributes to industry practitioners to enhance their understanding of PPVC in order to increase the affordability and sustainability of houses in the future development of Malaysian industry. 2019-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/81091/1/LohSengYapMSKA2019.pdf Loh, Seng Yap (2019) Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125161
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Loh, Seng Yap
Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
description Prefabricated Pre-finished Volumetric Construction (PPVC) is the advanced modular construction technology introduced by Singapore Building and Construction Authority (BCA) to promote a modern practices in construction sector which rectifying the fragmentation of construction industries towards higher productivity and more efficiency in project delivery. PPVC is an innovative approach to replace the traditional on-site construction method which construct a building using modular units away from the physical site but into a controlled factory environment. The adoption of PPVC has a significant solution to tackle the current level of quality, workmanship, productivity, non-environment construction, unaffordable housing, lacking on-site safety awareness, construction wastage and excessive reliance on unskilled foreign labors associated with conventional construction methods. In Malaysian, PPVC still lagging far behind in the development of Malaysian construction industry. The effectiveness of using PPVC can reduce the number of on-site contractors, increase the efficiencies in the use of resource and minimize the construction waste as well as reduce the overall of construction cost and durations. As a result, the aims of this study are to investigate the key factors affecting the adaptation of PPVC in Malaysia Construction Industry and thus recommend a criteria of feasible mitigation strategies in order to increase the possibility of using PPVC in the future development of Malaysian industry. To achieve these goals, questionnaire was administered by goggle survey form and distributed to industry experts who had working experience in the building industry. A total of 63 responses was received in this survey. Lastly, the results showed that highest number of respondents agreed that the effectiveness of using PPVC were “reduce the overall construction time”, “reduce on-site manpower and equipment requirement”, “better quality of workmanship, efficiency and productivity”. Results also implied that the top three important factors were “lacking experiences of current contractors, subcontractor on PPVC method”, “lacking PPVC of design experience, technical & installation” and “require high operation for capacities of heavy lift crane”. It also revealed the three effective mitigation strategies were “the use of Building Information Modelling (BIM) to tackle the building modular construction and coordination”, “intense coordination to ensure work sequence with minimal delays” and “early involvement of contractors and suppliers / manufacturers during the design phase of the project”. Moreover, there are significant risk on using PPVC as the reliability is much harder to guarantee than conventional construction method. PPVC can be very beneficial to a project, but only if everyone involved has the proper experience and ability to perform such activities. This study contributes to industry practitioners to enhance their understanding of PPVC in order to increase the affordability and sustainability of houses in the future development of Malaysian industry.
format Thesis
author Loh, Seng Yap
author_facet Loh, Seng Yap
author_sort Loh, Seng Yap
title Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
title_short Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
title_full Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
title_fullStr Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
title_full_unstemmed Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
title_sort key factors affecting the adaptation of prefabricated prefinished volumetric construction (ppvc) in malaysia industry
publishDate 2019
url http://eprints.utm.my/id/eprint/81091/1/LohSengYapMSKA2019.pdf
http://eprints.utm.my/id/eprint/81091/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125161
_version_ 1643658607852519424
score 13.211869