Consequences of non-value adding activities on construction project performance
Non-value adding activities (NVAAs) are considered as problematic in project management. If the NVAAs are not determined, the performance of the contractor during the construction process will be affected. Most of the construction practitioner does not realize that most of the activities performed d...
Saved in:
Main Author: | Abdul Rahim, Abdul Rafie |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/80844/1/AbdulRafieAbdulMSKA2019.pdf http://eprints.utm.my/id/eprint/80844/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125092 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Barriers to the implementation of value management in small construction projects
by: Lin, Xiaobin, et al.
Published: (2022) -
AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2010) -
Value Management Implementation Model for Construction Projects in Developing Countries
by: KINEBER, AHMED FAROUK ELSAYED
Published: (2021) -
The Cost Monitoring of Construction Projects Through Earned Value Analysis
by: Khamidi, M. Faris, et al.
Published: (2011) -
The Cost Monitoring of Construction Projects through Earned Value Analysis
by: Waris, Ali Khan, et al.
Published: (2012)