Ketidakpatuhan pendepositan perakuan siap dan pematuhan bagi rumah sesebuah milik individu

The implementation of non-deposit of the certificate of completion and compliance for sole possession of the residential lots. Starting in 2007 Certificate of Occupancy has been replaced with a Certificate of Completion and Compliance or known as the CCC. With the abolition of SK.M, CCC became effec...

Full description

Saved in:
Bibliographic Details
Main Author: A. Rahman, Muhammad Taufik
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/78792/1/MuhammadTaufikRahmanMFGHT2017.pdf
http://eprints.utm.my/id/eprint/78792/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:106523
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The implementation of non-deposit of the certificate of completion and compliance for sole possession of the residential lots. Starting in 2007 Certificate of Occupancy has been replaced with a Certificate of Completion and Compliance or known as the CCC. With the abolition of SK.M, CCC became effective for all applications beginning of the year. CCC was created to facilitate the application and provide power for permatuhan PSP PSP where feasible to certify the CCC. Prior to CCC deposited some stage needs to be fulfilled, namely G1 staggered form so that G 21. The forms needs to be fulfilled by qualifications and their respective consultants. In the form of the PSP have gradually through the components for a registered contractor is entitled to the certificate. During the preparation of the form of noncompliance when appointment of contractors who do not enroll in and PSP is no form validation certificates. In due form and rated the failed fulfilled then the PSP will not be able to deposit rating of CCC to the local authorities. This problem occurs is caused cooperation between the PSP, the contractor and the owner also did not reach consensus among themselves. Each chose his own path in the construction are on the run. With the occurrence of such case, the non-compliance occurs when the uniformity of the building plans approved for construction on site. Because of the various parties, including industry players affected by the impact when the residence is not up to the criteria of PBT and instructions KPKT as was gazetted in 2007.