Proof of documentation in claming extension of time
Construction projects have become increasingly complex and are subject to various risks, thus delays or disruptions to project programmes become an unavoidable issue. In Malaysian Standard Forms of Contract, the lists of relevant events are provided to allow the contractor to claim for extension of...
Saved in:
Main Author: | Wong, Ing Sing |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/78628/1/WongIngSingMFAB2016.pdf http://eprints.utm.my/id/eprint/78628/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
EXTENSION OF SEISMIC INVERSION FROM ELASTIC TO ELECTRICAL PROPERTY FOR A COMPLETE RESERVOIR CHARACTERIZATION
by: LIN, LEW CHEAN
Published: (2019) -
Documentation of Seri Menanti palace using three-dimensional phase shift terrestrial laser scanner
by: Cheong, Siew Chin
Published: (2013) -
AN INTEGRATED GEOPHYSICAL APPROACH USING RESISTIVITY AND
ELECTROMAGNETIC DATA TO DELINEATE THE EXTENSION OF PENYU
BASIN IN PEKAN, PAHANG.
by: ABDULLAH, ASHLEY AISYAH YOONG
Published: (2020) -
INVESTIGATION OF THE ONSHORE EXTENSION OF PENYU BASIN UNDERNEATH PEKAN, PAHANG: EVIDENCE FROM GRAVITY, MAGNETIC AND SEISMIC
by: MOHD MAZLAN, MUHAMMAD RADZIAMIR
Published: (2020) -
Time at large: implication for liquidated damages
by: Mustaffar Kamar, Nurul Iman
Published: (2017)