Process modification of Total Site Heat Integration profile for capital cost reduction

The Total Site Profile (TSP) can be a powerful tool to evaluate the potential for further Heat Integration improvement for a Total Site (TS). A systematic Total Site Heat Integration (TSHI) methodology to target decreasing the capital cost of heat transfer units at Total Sites has been developed. Th...

Full description

Saved in:
Bibliographic Details
Main Authors: Chew, K. H., Klemeš, J. J., Wan Alwi, S. R., Manan, Z. A.
Format: Article
Published: Elsevier Ltd 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/75358/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84924709393&doi=10.1016%2fj.applthermaleng.2015.02.064&partnerID=40&md5=f5dff81498471d8c9a1e3db68a3aed0d
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The Total Site Profile (TSP) can be a powerful tool to evaluate the potential for further Heat Integration improvement for a Total Site (TS). A systematic Total Site Heat Integration (TSHI) methodology to target decreasing the capital cost of heat transfer units at Total Sites has been developed. The methodology includes a set heuristics that have been developed to identify and prioritise the strategic process changes to apply, as a result of changes in the TSP shape. The TSP and expanded Total Site Problem TableAlgorithm (TS-PTA) can provide useful insights for the plant designers to identify "where", in terms of which temperature interval, and which streams within the entire TS to focus the process modification efforts. The keep hot stream hot (KHSH) and keep cold stream cold (KCSC) principles can be applied to favourably change the TSP shape to provide a larger temperature driving force to further reduce the HTA and capital costs. In one of the case study, the application of KHSH and KCSC on TSP increases the temperature driving force between the medium pressure steam utility and process resulting in a reduction of 3,827m2 heat transfer area (HTA) and a saving of 10% in heat exchangers cost. The proposed changes to the selected streams should be assessed from feasibility, practicality and economic perspectives. The selected and potentially acceptable process modification options can be conveniently merged with potential retrofit project (e.g. to increase plant capacity) considered for the Total Site.